PTI DC80.1-02: Controlled Demolition of an Unbonded Post-Tensioned Concrete Slab

second edition (1992)

This report describes the controlled demolition of 100,000 square feet of post-tensioned slab, which was necessitated by suspicion of damage due to fire. The saw-cutting procedure was used to neutralize over 900 post-tensioned tendons. The report illustrates that, if required, slabs constructed with unbonded post-tensioned tendons can safely and readily be dismantled. The report concludes with recommendations for demolition of similar projects.

30 pages; 8½ x 11 in. (available as a photocopy)

Price: $ 11.00
Qnty:

 

 

 
© 2008 Post Tensioning Institute. All Rights Reserved